Hudson Massachusetts Home Page
Search

Frequently Asked Questions

Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.

Stormwater Utility

3
  • The MS4 Permit is issued by the Environmental Protection Agency for stormwater discharges to wetlands and water bodies.

    Stormwater Utility
  • The permit is divided into two sections, the "Minimum Control Measures" (MCMs) and Water Quality Standards.

    Minimum Control Measures

    There are six minimum control measures consisting of the following: 

    1. Public Education and Outreach
    2. Public Participation
    3. Illicit Discharge Detection and Elimination
    4. Construction Site Runoff Control
    5. Post Construction in New and Redevelopment
    6. Good Housekeeping and Pollution Prevention

    In general, these MCMs require municipalities to:

    • Create and implement various plans and maps
    • Conduct inspections of infrastructure and construction sites
    • Perform lab analysis of non-stormwater discharges (illicit discharges)
    • Develop, review, and implement reports, programs, bylaws, rules, and regulations
    • Enforce pollution prevention at construction sites
    • Maintain stormwater infrastructure
    • Perform retrofit analysis and implement retrofits for stormwater infrastructure

    Water Quality Standards

    According to the latest Integrated List of Waters 303(d) list as developed by the Department of Environmental Protection (DEP), some waterways within the Town of Hudson are impaired (polluted). Discharges to impaired water bodies amplify the MCMs by requiring additional documents, reports, and educational requirements. Impaired water bodies in Hudson are Lake Boon, Fort Meadow Reservoir, and the Assabet River. 

    See the latest Impairment Map (JPG).

    Stormwater Utility
  • In the last permit year, (Permit Year 5), the Town of Hudson:

    • Removed about 200 yards from catch basin cleaning;
    • 764 Tons of debris from street sweeping was removed;
    • Reduced impervious surfaces at Cox and Old Bolton Road intersection
    • Distributed educational materials at outreach meetings and on the website.

    In Permit Year 6, the Town of Hudson created a new position, and hired a Stormwater Manager. The Stormwater Manager will implement MS4 permit compliance requirements and address stormwater or flooding concerns.

    Stormwater Utility
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow